As of March 31, 2025, my country’s commercial operation nuclear power units had a total of 58 platforms (excluding Taiwan area), and the machine capacity was 61007.74MWe (rated machine capacity). From January to March 2025, a total of 1 nuclear power plant will be invested in commercial operation in the country, see Table 1 for details.
(Source: “China Nuclear Energy Industry Association”)
Table 1: 20Sugar babyJanuary-March 25
1. Nuclear power production situation
20Sugar baby From January to March 25, when the cumulative power generation in the country was 226.685 billion kilowatts, the cumulative power generation of the operating nuclear power assembly was 1144.5Sugar When baby700 kW, it accounts for 5.05% of the national cumulative power generation, see Figure 1 for details.
Figure 1: Statistical distribution of national power generation from January to March 2025
When the cumulative power generated by national operating nuclear power units was 11.4457 billion kilowatts, an increase of 10.02% over the same period in 2024; the cumulative online power was 107Sugar baby5.Sugar baby1.1 billion kilowatts, up 10.13% from the same period in 2024, see Table 2. Compared with coal-fired power generation, nuclear energy generation from January to March 2025 was comparable to reducing combustion standard coal by 31.2212 million, reducing emissions of 81.7994 million, reducing sulfur dioxide emissions of 265,400, and nitrogen oxides by 231,000.
From January to March 2025, the number of nuclear power equipment application hours was 1965.96 hours, and the average machine capacity factor was 93.22%. For details, please see Table 3. Do you have the monthly power generation of nuclear power units in 2024 and 2025? “I get off work at 6 o’clock” and Internet power trends. Figure 2 and Figure 3 are shown in Figure 2 and Figure 3 respectively.
Table 2: Power production indicators for nuclear power units for operation from January to March 2025
Table 3: 2025Sugar babyJanuary to MarchManila escortSugar babySugar babySugar escortSugar src=”https://img01.mybjx.net/news/WechatImage/202505/17465245469855624.png” alt=”” data-href=”” style=””/>
Instructions:
1) The data of the No. 1 machine unit of the National Nuclear Demonstration Project is not bad.
2) In this table “Comprehensive Value/Overall Value/Equal Value”, the machine capacity, power generation, and Internet power are the combined values of each machine group. The application time of the nuclear power equipment is the overall value of all machines. The machine can only factor the calculation equal value of all participating machines.
Figure 2: January 2024 to 202Sugar daddyThe national operating nuclear power unit power generation trend in March 5
Figure 3: Internet power trends for nuclear power units in the national operation from January 2024 to March 2025
2. Safety production situation of nuclear power
From January to March 2025, our country’s nuclear power plant strictly controlled the operational risks. The completeness of fuel element shells, the completeness of the first-circuit pressure boundary, and the completeness of the safe shells all meet the technical specifications; no operational activities of the International Nuclear Service Level (INES) level 1 and above; no operational activities occurred; no href=”https://philippines-sugar.net/”>Sugar daddyGeneral and above radiation changes; no larger or higher occurredSugar daddy Production safety changes; no ordinary or above emergencies occur; no occupational disease persecution changes and professional overdose illumination.
III. Radioactive effluent emissions and environmental monitoring
In accordance with the National Environmental Protection Law and Environmental Radiation Monitoring Standards and the National NuclearSugar daddy href=”https://philippines-sugar.net/”>Escort The emission limit agreed by the Ping An Bureau, my country’s operating nuclear power plant has strictly controlled the emission of radioactive effluents and conducted useful monitoring of the radiation environment around the nuclear power plant.
Radical effluent discharge from January to March 2025 The results of the release of statistics show that the emissions of radioactive effluents from my country’s nuclear power plant are lower than the limit agreed by the National Nuclear Safety Administration. The radio environmental monitoring data from January to March 2025 revealed that the environmental air receiving agent measured by the automatic monitoring stations of various operating nuclear power bases is within the normal range of the local background radiation level, and no abnormalities caused by nuclear power operation were detected.
IV. Major activities in the first quarter
On January 10, the China Geological Survey Bureau of the Ministry of Natural Resources announced that the China Geological Survey Bureau will join hands with the China Petroleum Chief Oilfield BranchSugar Daddy Department, China Nuclear Industry Qualification Bureau and other units have received serious breakthroughs in the Yanchuan area of the Ordos Basin, and the resource volume is large and large. The discovery of Yanchuan Miner will form a new situation in the Yanxing Miner, which will greatly increase the amount of our Yanxing resources, and will be useful to save our Yanxing resources. During a nap, she did a Sugar baby dream. Level of certification.
On January 15, the National Nuclear Safety Bureau held the 2025 nuclear and radiation safety supervision work promotion meeting, deeply implemented the energy of the national ecological environment protection task meeting, summarized the 2024 nuclear safety supervision work, and planned to accelerate the construction of modern nuclear safety construction. The thinking measures of the security monitoring system are arranged to arrange key tasks for 2025. On February 13, China Nuclear Energy and Power Co., Ltd. (simplified Chinese Nuclear Energy) released news. The nuclear intelligence AI door developed by China Nuclear Energy’s Nuclear Operations Research Institute successfully joined the DeepSeek model andThe “Nuclear Intelligence” model released in the future helps to fully upgrade nuclear power applications. On February 14, the last main equipment of the Hainan Changjiang No. 4 nuclear power unit, built by China Nuclear Industry Fifth Construction Co., Ltd., was successfully completed in the suspension and in place. At this point, all the main equipment of the Hainan Changjiang Nuclear Power Company Manila escortAll the main equipment installation task of the Hainan Changjiang Nuclear Power Company has been completed.
On February 14, Zhangzhou Nuclear Power Engineering held a temporary inspection of the No. 1 machine unit. Representatives of Zhangzhou Dynamics and China Nuclear Engineering signed a temporary acceptance (PAC) certificate, marking the responsibility of the custody and governance of the system by a young girl in China Nuclear Corporation looked at her mobile phone with her head down and did not notice her coming in. The project was officially handed over to Zhangzhou Power. On February 24, the No. 1 machine set of Guangdong Hong Nuclear Power Project No. 1 completed the construction of the first tank of concrete on the nuclear island, marking that the main project of the machine set was officially started, and the construction of the double-third-generation nuclear power project of Guangdong Hong Nuclear Power Project was fully opened.
On March 10, the Nationa TC:sugarphili200